access control system; |
 |
ventilation of the flair department; |
 |
study of the sewer backflow and infiltration; |
 |
modification to the cafeteria; |
 |
layout of the crusher; |
 |
modifications to the No. 4 building; |
 |
preventive maintenance program for the entire plant; |
 |
new mercury room; |
 |
study of the electric substation; |
 |
surveys and drawings of the existing plant piping network; |
 |
design of the Hg scrubber; |
 |
new lean-to buildings for the No. 4 line; |
 |
rehabilitation of traffic lanes used by power lift trucks; |
 |
implementation of the 9000 unit; |
 |
layout of the Hg showers; |
 |
study of the water network; |
 |
layout of the solutions chamber; |
 |
protection of hydraulic tanks; |
 |
installation of the SO 2 scrubber; |
 |
layout of the maintenance shop; |
 |
energy efficiency study. |