DURATION
1994 |
 |
 |
PROJECT CHARACTERISTICS
 |
The works were performed in conjunction with Hydro-Québec's operations group. |
 |
Given the height of the installations, visual surface inspections were conducted using the rappelling technique and climbing equipment. |
 |
In addition to the underwater inspection, concrete core drilling was also done underwater. |
 |
Lastly, Casagrande piezometers were installed in all of the drill holes. |
|
 |
SERVICES RENDERED
 |
Detailed description of the characteristics of concrete surfaces |
 |
Coring and drilling of concrete elements |
 |
Underwater inspection |
 |
Inspection of steel components |
 |
Inspection of buildings (water inlet and central) |
|
 |
PROJECT DESCRIPTION
The Saint-Narcisse facilities include a dam, completely spanning the river, and a central station more than 500 metres downstream, the two connected by an underground headrace. The dam, 21 metres high, includes a water inlet, a gravity dam structure, a weir, a 3-sluice spillway, a logway and two wing walls with earth embankments. A total of 7 HQ-3 drill holes and 21 boreholes with a 100‑mm diameter were made. The investigation led to recommendations for rebuilding the dam so as to
ensure its safe operation for an additional 30-year period.
|
 |
|
|
|
|
 |
|