|
 |
|
PORT OF MONTRÉAL
LAYOUT OF THE BULK TERMINAL, SECTIONS 98 TO 100
|
CLIENT
Montreal Port Authority
LOCATION
Montréal
DURATION
2000-2001 |
 |
 |
SERVICES RENDERED
 |
Processing and validation of topographic information supplied by the Port of Montreal. |
 |
Study on the site layout in function of user needs, that is, the definition and location of storage areas, handling areas for unloading of boats and loading of trucks, circuits for trucks and location of scales, parking lots for trucks and personnel as well as the elaboration of needs in water, sewer, electricity and telecommunication services. |
 |
Preparation of final drawings, specifications and estimates for the bid invitation taking into account two phases of works and managing trickling waters in order to evacuate them from the site according to environmental regulations. |
 |
Supply of office services during the construction and including, if needed, site visits and assisting to site meetings. |
 |
Validation of technical data sheets and shop drawings. |
 |
Preparation of as-built drawings. |
|
 |
PROJECT DESCRIPTION
This project consists in the layout of an 80 000 square-meter paved service area to store bulk materials such as salt, coal, gypsum, glass and other kinds of material.
It includes the following works: excavation, roadway structuring, storm and domestic sewers, waterworks system, outdoor lighting, installation of telecommunication services, scales and gatehouse. |
 |
|
|
|
|
 |
|