PROJECT CHARACTERISTICS Teknika HBA
performed all detail engineering with regard to the installation of electrical equipment, protection equipment, wiring, cabling and the procurement of equipment.
SERVICES RENDERED We performed detailed engineering for our client in the following areas:
implementation of equipment at the site (4 sets of 230 kV bars);
coordination of implementation and civil engineering plans;
implementation of equipment in the facilities (control);
procurement of control and protection panels;
preparation of lists of equipment, alarm locations, ECE points and cabling;
preparation of installation specifications;
PROJECT DESCRIPTION Modifications to the set of 230 kV bars at the Nicolet station to enable integration with the direct current converter station.