MCCONNELL-LARAMÉE BOULEVARD T2/T3
|
CLIENT
Québec Ministry of Transport
LOCATION
Gatineau
DURATION
2003-2005
|
 |
 |
PROJECT CHARACTERISTICS
Urban and natural protection context; roundabouts, reserved bus lanes, main thoroughfares; reduced maintenance.
Embankment and 5m high noise screen development; integration of bus stop zones and pedestrian frontage roads; indigenous landscaping in Parc de la Gatineau.
. |
 |
SERVICES RENDERED Design, working drawings and construction details and approval briefings with the CCN and the City of Gatineau, Powerpoint presentation, specifications and cost estimates, proposal documents, site supervision and billing follow-up |
 |
PROJECT DESCRIPTION
Urban landscaping (City of Gatineau) and the Parc de la Gatineau (National Capital Commission) on a length of approximately 10 km.
|
 |
|