PROJECT DESCRIPTION
Works have comprised, ex ante, of the reconditioning of waterworks and sewer conduits, service connections, manholes, catch basins, street subbase, pavement, curbs and sidewalks. Pavement is made of bituminous concrete.
The East side of the street has a cast concrete curb while on the West side, we find a 1 750-mm wide concrete si-dewalk.
|