CAISSE DE DÉPÔT ET PLACEMENT DU QUÉBEC
|
CLIENT
Caisse de dépôt et placement du Québec
LOCATION
Montréal
DURATION
2000 - 2002 |
 |
 |
SERVICES RENDERED
Teknika HBA
generated plans and specifications for the plumbing, fire protection, heating, cooling and humidification systems. The primary equipment included :
 |
Plumbing and combustion gas exhaust |
 |
Heating :
| - |
Six hot water condensing boilers (total capacity of 15 000 000 BTU/h (450 BHP)) for fresh air and perimeter heating, and one humidifying steam boiler (capacity of 1 500 000 BTU/h (45 BHP)). |
|
 |
Cooling:
| - |
Three spin coolers (total capacity of 1 600 tons) with three cooling towers and one 200 ton cooler with cooling tower, for the server rooms. |
|
 |
Centralized controls |
 |
Fire protection |
|
 |
PROJECT DESCRIPTION
Located in the quadrilateral formed by Viger, Bleury, Saint-Antoine and Square Victoria Streets, the building was to be built over the Ville-Marie Expressway. The building's floor surface, including the basement, totals 700 000 ft², and it incorporates a tunnel system leading to the metro, as well as 12 above-ground floors, with the majority of the space dedicated to offices. This project required the use of two emergency generators (750 and 1 250 kVA) to ensure electrical power. |
 |
|
|
|
|
 |
|