preliminary studies of technical options and comparison of costs and benefits; |
 |
preparation of single-line operating and distribution diagrams; |
 |
participation in negotiations with the supply authority (Hydro-Québec); |
 |
procurement specifications for major equipment such as power transformers, switches and the new 25 kV, 6 MVA outdoor substation; |
 |
plans and specifications for the construction of a 6-km section of a 25 kV overhead distribution line operated at 12 kV, and the installation of overhead or pad mount distribution transformers, depending on requirements; |
 |
plans and specifications for modifications to overhead and underground electrical inlets of existing buildings; |
 |
architectural modifications as necessary; |
 |
supervision of multiple-phase works; |
 |
provisional and final acceptance of the works. |